Peter proposed a phased rebuild. Management balked at downtime; finance saw cost, not risk. So Peter started small. He tuned. He swapped a valve here, changed a spool there, added bleed orifices like surgical stitches. At night he poured over Rohner’s descriptions of stability margins and loop interactions, cross-referencing with the plant’s original schematics. He began drawing his own schematics — the real ones — overlaying control responses with actual load traces.